Skip to main content

Rebecca Harris

Member of Parliament for Castle Point

Main navigation

  • Home
  • About Rebecca
  • News
  • My Campaigns
  • Constituency
  • In Parliament
  • Campaign Responses
  • Contact

Oikos OMSSD Project

  • Tweet
plan

Oikos Storage Ltd are currently engaged in the preparation of an application for a Development Consent Order in respect of works to improve the operational efficiency of the existing site on Canvey Island. A non-statutory consultation exercise, introducing the proposal, was undertaken by Oikos in 2019. Please note: the consultation exercise is NOT being undertaken by Castle Point Borough Council. The proposal is to be considered and determined by the Secretary of State for Transport.

The OMSSD project consists of the installation of new import and export infrastructure, including marine loading arms and pipelines on the existing operational jetties and the construction of new storage tanks across the southern part of the facility. Other associated works such as a new workshop, additional road tanker loading facilities, additional on-site parking, an extension to the existing office and off site ecological mitigation works also form part of the OMSSD.

Oikos have posted a Statement of Community Consultation on the Oikos website. The document sets out how consultation on the proposed development will be undertaken & includes details of the Project Exhibition. 

The Statutory Consultation Period, will run until the 18th May 2021.

Once the consultation has finished OIKOS will review all feedback received and use this along with their final assessment work to complete their project proposals ready for submission to the Planning Inspectorate (PINS) later in 2021. Although the timeframe will then be determined by PINS, and subject to PINS accepting our application, OIKOS anticipates that the examination period into the OMSSD project would begin in late 2021, with a decision due by late 2022. They predict that construction will start on site in early 2023.

Consultation Booklet (attached below)

This provides a non-technical summary of the information contained within the Preliminary Environmental Information Report (PEIR). It also outlines information relating to the consultation process, ways to get involved and how to respond.

Attachments

Attachment Size
Consultation Booklet (6.22 MB) 6.22 MB

Constituency

  • New Draft Local Plan 2023-2043
  • North Benfleet Hall Farm Development
  • My Priorities for Castle Point
  • Old Castle Point Local Plan
  • Guide to commenting on planning applications
  • Consultation Responses to Developers
  • Castle Point Boundary Review
  • Helping with the Cost of Living
  • Canvey Lake
  • Canvey Island X-Ray Machine
  • Oikos
  • Canvey Island Flood Defences
  • Useful Local Contacts

Rebecca Harris MP Member of Parliament for Castle Point

Footer

  • About RSS
  • Accessibility
  • Cookies
  • Privacy
  • About Rebecca Harris
  • In Parliament
Promoted by James Cutler on behalf of Rebecca Harris, both at 8 Green Road, Benfleet, Essex SS7 5JT Tel: 01268 792992;
Copyright 2025 Rebecca Harris MP Member of Parliament for Castle Point. All rights reserved.
Powered by Bluetree